(Updated Monday, December 14, 1998)

Merry Christmas, Everyone!
![]() Southwest |
![]() Northwest |
![]() Southeast |
![]() Northeast |
| The Dept. of Public works has
managed to get the new sidewalks completed and the main street paved in addition to putting up the municipal Christmas decorations. Nice Job! |
|

This year Santa has opened a branch depot on the C&PRC.

Site Plan for the C&PRC at Grenache
(Track is at an elevation of 29 5/8")

The C&PRC has brought new life to the community. More and more
people are
deciding to settle here now that the railroad is in town (Nov 30, 1998).

The C&PRC after final site preparations are complete ( Nov 28, 1998).

Benchwork for the left pod in place (Nov 28, 1998).

Benchwork and table support for the right pod in place (Nov 28, 1998).


Track plan is operational. Next, the table.
Mock-up of Plans for Grenache Site
Last Consist on the Zinfandel Branch.
Future Site of the C&PRC At Grenache